Document Library
Hornsby Park Master Plan Stage 1 – Review of Environmental Factors (REF)
- Hornsby Park Master Plan Stage 1 REF (PDF 1.77MB)
- Stage 1 REF Community Engagement Report (PDF 338kb)
- REF Attachments A-K
Hornsby Park Master Plan
- Adopted Master Plan (PDF 36MB)
- Elton Consulting Outcomes Report (PDF 6.6MB)
- Micromex Survey Report (PDF 3MB)
Review of Environmental Factors (REF) and supporting documents
- Proposal footprint – location view (PDF 3.1MB)
- Review of Environmental Factors (REF) – Hornsby Park Drainage Upgrade Project (PDF 37.4MB)
- Executive Summary (PDF 58kb)
- Site Plan (PDF 1.4MB)
Draft Hornsby Park Master Plan
- Draft Hornsby Park Master Plan (PDF 65MB)
- Draft Hornsby Park Master Plan – Project Overview (PDF 29.1MB)
- Hornsby Westleigh Connection (JPG 8.4MB)
- Hornsby Quarry Old Mans Valley – Vegetation Survey (PDF 9.7MB)
Previous Engagement
- Outcomes Report – ‘The Hornsby Quarry Rehabilitation Works Development Application – Response to Submissions and Revised Project Scope (RTS)’ – Dec 2019 (PDF 5.6MB)
- Outcomes Report – ‘Hornsby Park EIS Communication and Engagement’ – Nov 2018 (PDF 690kb)
- Outcomes Report – ‘Plan Your Parkland’ – June 2017 (PDF 5.8MB)
- Vegetation Management Plan and Habitat Creation and Enhancement Plan – Hornsby Quarry Rehabilitation (PDF 40MB)
- Hornsby Quarry Development Application
Hornsby Quarry Rehabilitation Pollution Incident Response Management Plan (PDF 584kb)
DA/101/2019 Supporting Studies and Investigations
- Environmental Impact Statement Volume 1 Main Report (PDF 15MB)
- Environmental Impact Statement Volume 2 Appendices A-F (PDF 34MB)
- Environmental Impact Statement Volume 3 Appendices G-K (PDF 61.7MB)
- Environmental Impact Statement Application Summary & Supporting Plans (PDF 16.3MB)
- RTS Report VOLUME 1 – Hornsby Quarry RTS (PDF 5.7MB)
- RTS Report – APPENDIX A – Figures (PDF 20.5MB)
- RTS Report – APPENDIX B – Retaining wall details and overall site plan (PDF 3.3MB)
- RTS Report – APPENDIX C – Detailed Response to Independent Planning Consultant and Specialists (PDF 617kb)
- RTS Report – APPENDIX D – Detailed Responses to RFIs from NSW EPA (PDF 8.7MB)
- RTS Report – APPENDIX E – Community Engagement Outcomes Report (PDF 8.2MB)
- RTS Report – APPENDIX F – Preliminary VMP (PDF 10MB)
- RTS Report – APPENDIX G – Tree Survey Reports (PDF 11.9MB)
- RTS Report – APPENDIX H – Traffic Impact Statement (PDF 2.2MB)
- RTS Report – APPENDIX I – Detailed CSI (PDF 31MB)
- RTS Report – APPENDIX J – RAP (PDF 4.9MB)
- RTS Report – APPENDIX K – Preliminary CEMP (PDF 7.2MB)
- Response to SNPP Deferral (PDF 56kb)
- DA Deferral Submissions Report (includes VMP & HCEP) (PDF 36.1MB)
- Approved Existing Site Plan – Hornsby Quarry (PDF 2.4MB)
- Approved Landform Plan – Hornsby Quarry (PDF 2.4MB)
- Approved Cross Sections – Hornsby Quarry (PDF 2.1MB)
- Approved Extent of Works – Hornsby Quarry (PDF 3.2MB)
- Approved Site Management Plan – Hornsby Quarry (PDF 2.1MB)
- Approved Cut and Fill Plan – Hornsby Quarry (PDF 7MB)
- Approved Retaining wall details and overall Site Plan – Hornsby Quarry (PDF 3.4MB)
- Approved Revised extent of Works and Vegetation Mapping – Hornsby Quarry (PDF 1.9MB)
- Notice of Determination – DA/101/2019 – Hornsby Park, HORNSBY NSW 2077 – Development – Hornsby Shire Council – Design And Construction (PDF 290kb)
Coffey Reports (1989, 1990 and 2016)
- Coffey (1989), Proposed Filling, Old Man’s Valley, Hornsby, Coffey Ref S84632-AC (PDF 10MB)
- Coffey (1990a), Rock Mechanics Study – Hornsby Quarry, Old Man’s Valley, Coffey Ref S8463-4-AD (PDF 7.2MB)
- Coffey (1990b), Geotechnical Investigations, Old Man’s Valley, Hornsby, Coffey Ref S84633- AG (PDF12.4MB)
- Coffey (2016), Geotechnical Assessment of the Hornsby Quarry Void, Geotechnical Assessment Report, Coffey Reference GEOTLCOV25707AA-AB (PDF 17.6MB)
Rehabilitation of Hornsby Quarry (report to Council October 2014)
Clouston Associates – Recreation Potential Study for Hornsby Quarry and Old Mans Valley (2014)
Cardno – Hornsby Quarry Land Filling Preliminary Impact Assessment (April 2013)
- Main Report (PDF 5.8MB)
- Appendices (PDF 6.9MB)
Pells Sullivan Meynink Pty Ltd Geotechnical Report (February 2007) – Identifying the geotechnical and hydrogeological constraints relevant to land use options within Hornsby Quarry.
- Main Report (PDF 1MB)
- Plates (PDF 1.7MB)
- Drawings 1 (PDF 9.1MB)
- Drawings 2 (PDF 3.1MB)
- Drawings 3 (PDF 570kb)
- Drawings 4 (PDF 2.7MB)
- Drawings 5 (PDF 2.3MB)
- Drawings 6 (PDF 296kb)
- Drawings 7 (PDF 473kb)
- Drawings 8 (PDF 473kb)
- Drawings 9 (PDF 473kb)
- Drawings 10 (PDF 473kb)
- Drawings 11 (PDF 473kb)
- Drawings 12 (PDF 473kb)
- Drawings 13 (PDF 473kb)
- Drawings 14 (PDF 473kb)
- Drawings 15 (PDF 473kb)
- Drawings 16 (PDF 473kb)
- Drawings 17 (PDF 473kb)
- Drawings 18 (PDF 473kb)
- Drawings 19 (PDF 473kb)
- Drawings 20 (PDF 473kb)
- Drawings 21 (PDF 473kb)
- Drawings 22 (PDF 473kb)
- Appendix A (PDF 4.1MB)
- Appendix A – Attachment A1
- Appendix A – Attachment A2
- Appendix A – Attachment A3
- Appendix A – Attachment A4
- Appendix B (PDF 446kb)
- Appendix C (PDF 707kb)
- Appendix D (PDF 11.2MB)
- Appendix E (PDF 2.9MB)
- Appendix F (PDF 3.8MB)
- Appendix G (PDF 1.3MB)
- Appendix H (PDF 1.1MB)
- Appendix I (PDF 391kb)